IPAC’23 / PARTICLE ACCELERATOR PROJECTS AND UPGRADES 60 Project Region Asia and Australasia Project Location China Project Type New Project Project Description The CSNS facility is designed to provide multidisciplinary research. Requirements List Available No Approval Date 03/09/2011 Status of Contracting Completed construction, open to users Construction scheduled to start 20/10/2011 Estimated Project Cost 1.86632 Billion CNY Estimated Construction Duration 6.5 Type of Equipment to be Purchased a 80-MeV H- linac,a 1.6-GeV proton rapid cycling synchrotron (RCS), beam transport lines, a solid tungsten target station, and 4 instruments for the pulsed spallation . Beam power on target is 140kW. Project Leader(s) Hesheng Chen Affiliation Institute of High Energy Physics e-mail chenhs@ihep.ac.cn Contact Person(s) Yansheng Geng Affiliation Dongguan Campus, Institute of High Energy Physics e-mail gengys@ihep.ac.cn China Spallation Neutron Source