IPAC'23 - Particle Accelerator Projects and Upgrades

IPAC’23 / PARTICLE ACCELERATOR PROJECTS AND UPGRADES 74 Project Region Asia and Australasia Project Location South Korea Project Type New Project Project Description The Multi-purpose Synchrotron Radiation Construction Project was started officially on July, 2021 with the budget of 845.4 Billion KRW. This project aims to build 4 GeV storage ring with an emittance less than 100 pm by adopting multi-bend achromatic structure. Its circumference is about 800m with 28-fold symmetry, and the length of ID section is about 6.5m long. It can host more than 40 beamlines, but there are 10 beamlines in the initial stage. Requirements List Available No Approval Date 01/07/2021 Status of Contracting None Construction scheduled to start 2024 Estimated Project Cost 845.4B KRW Estimated Construction Duration 4 years Type of Equipment to be Purchased TBA after TDR is confirmed Project Leader(s) Dr. In Soo Ko Affiliation Korea Basic Science Institute e-mail koinsoo@kbsi.re.kr Contact Person(s) Minsoon Park Affiliation Korea Basic Science Institute e-mail mercurien@kbsi.re.kr Multipurpose Synchrotron Radiation Construction Project

RkJQdWJsaXNoZXIy MjQ4NzI=