IPAC’23 / PARTICLE ACCELERATOR PROJECTS AND UPGRADES 48 Project Region America Project Location Upton, New York, USA Project Type New Project Project Description Using the superconducting rings of RHIC to collide polarized electrons with polarized hadrons by adding an 18 GeV electron storage ring in the RHIC tunnel which yields a maximum centre of mass of 140GeV. Target luminosity is up to 1E34/cm^2/s Requirements List Available Yes Approval Date 19/12/2019 Status of Contracting contracting planned to start in spring 2024 Construction scheduled to start 15/04/2025 Estimated Project Cost 2.4B $ Estimated Construction Duration Type of Equipment to be Purchased magnets, vaccum, sc cavities, sc magnets, cryogenics, power technology, instrumentation, controls Project Leader(s) James Yeck Affiliation BNL e-mail yeck@bnl.gov Contact Person(s) Alyssa Petrone Affiliation BNL e-mail apetrone@bnl.gov Electron Ion Collider